Construction calculators that answer in bags, tins and boxes

Work out what a job actually needs - concrete for a slab, paint for a room, tiles for a floor - and get the answer in the units the shop sells, not just in cubic yards.

Pick a calculator

How it works

  1. MeasureEnter the room or the pour in feet, inches or metres. The tool converts, you do not.
  2. ChoosePick the bag, tin or box you can actually buy, and the waste allowance for the job.
  3. BuyTake the count to the merchant. Everything countable is rounded up, never down.

What you get is a shopping list

Rounding always goes the way that protects the job: never down. The cutting allowance is applied to the quantity before it is divided into units, not after, so it cannot be rounded twice. And every assumption behind the figure - spread rate, bag yield, waste - is a field you can set to whatever your own product says.

About

In this market

Ready-mix is ordered by the cubic yard and a truck carries about 10. Suppliers set their own minimum, commonly 3 to 5 yards, and charge a short-load fee of roughly $50 to $150 below it. That threshold, not the arithmetic, is what usually decides between a truck and a pallet of sacks on a small residential pour.